First-fix plumbing and heating to new-build apartments in central Bedford
domestic September 2025 | Central Bedford, Bedfordshire

9 new-build apartments — central Bedford

Supply and installation of all plumbing, heating, soil and waste first-fix services to nine new-build apartments, plus the communal area and office.

9 Apartments
Sept 2025 Completed
New build Scope

The project

Nine new-build apartments in central Bedford, plus a communal area and office, required a complete plumbing and heating package from first fix through to handover.

What we delivered

Supply and installation of all plumbing, heating, soil and waste first-fix services to the nine apartments and communal areas, including:

  • All bathroom and sanitaryware installations
  • Low Surface Temperature (LST) radiators
  • Gas combi boilers
  • Underground gas Tracpipe services
  • All external rainwater, guttering and downpipes

Why it worked

Sequencing the first-fix services correctly across the block kept the install tidy and on programme, with each apartment brought to a consistent standard ready for second fix and commissioning.


For a similar new-build package, contact us.